Sub-Zero Triple Installation
Topics:
- Can Sub-Zero products be installed 3 in a row?
- Are there specifications for a triple installation of Sub-Zero products?
- Is a heater kit or dual installation kit needed for triple installation?
Answer:
Any number of multiple Sub-Zero products can be installed together in combination or in a row. Keep the following in mind:
- A heater is needed between each pair of products if there is less than a 2" filler in between the products.
- For hinge to hinge installations, use 90° door stops to prevent cabinet damage.
- Add the individual product widths together for the overall opening width.
- The products can be installed in a freestanding installation as long as the anti-tip bracket for each product is installed.
- Refer to Sub-Zero Freestanding Installation for more information and instructions.
- Classic Series (CL) products can be installed right next to each other in a triple flush inset installation.
- Refer to the Classic Series Triple Flush Inset Installation Guide for specifications.
- See also, Sub-Zero Dual Installation Kit Information.
Refer to the Sub-Zero Design Guide for design specifications.
DID THIS ANSWER YOUR QUESTION?

We're standing by with answers
Whether you're shopping for appliances or have questions about those you already own, we've got the resources you need. Talk directly to a customer care expert at the Sub-Zero, Wolf, and Cove service center, or connect with an appliance consultant at an official showroom near you. Get quick answers online, or reach a certified service provider or installer. And much more.
Call us at (800) 222-7820